Drupal 10 ends in December.
Support for Drupal 10 stops on 9 December 2026, the week Drupal 12 arrives. Big sites take a while to move, so In a Box does the upgrade work on a copy well ahead.
Drush 13.8 and Composer
Our test on 24 October 2026 used Drupal 11.4.11. Sites run PHP 8.3 or newer, picked per site, with PHP-FPM and cron kept going and a MariaDB or PostgreSQL database each.
Clearing the way to Drupal 12
Upgrade Status lists the modules holding a site back. The assistant swaps or patches them on the dev copy and runs the site checks before release. Unused modules can be cleared out the same way.
Config in git
Drush exports the configuration into the repository and imports it on release. A change made on dev arrives on live as exactly that change.
Security releases, watched daily
Drupal publishes security fixes on the third Wednesday of each month. When one lands, Composer updates on a branch, drush updatedb runs, config is checked, and you get a preview before it goes live.
The Drupal 7 sites still around
Drupal 7 ran for 14 years until 5 January 2025. Large sites with many editors stay on Drupal.
